inklap

Risk Management on Floodway Projects on Quality Performance

, Fitri Suryani, , Dwi Dinariana, · Engineering and Technology Journal · 2025

One of the strategic steps taken by the government to overcome flooding is the construction of the floodway. This project is very important and innovative because it is the first river diversion in Indonesia that uses the Tunnel Boring Machine (TBM) technology. The complexity of the construction process, technical risks that have not been fully identified, and limited experience in implementing new technologies increase the chances of quality deviations. For this reason, a risk analysis is needed for the quality performance of this floodway project in order to understand the dominant risks that may arise, assess the level of impact on quality, and formulate appropriate responses or actions to reduce or eliminate the negative impacts of these risks. This study aims to identify, analyze and respond to the dominant risks in the implementation of the floodway construction on quality performance. This study is a qualitative study with data collection from literature studies and questionnaires with research steps of risk identification, risk analysis and response to risk. From the risk identification, there are 52 risks validated by experts into 43 risks, then in the risk analysis using

📖 افتح في inklap 🔗 DOI 📮 اطلب بحثاً