Menai and Conwy suspension bridges in Wales, both completed in 1826 to Telford's design, represented a significant advance in engineering science and were the culmination of extensive experiment and theoretical study. Telford established practices and procedures during the design and construction of the 177 m span Menai and 100 m span Conwy bridges for experiment, analysis, test and inspection that are recognised to this day as good practice in engineering. The ideas and methods adopted have had a lasting influence upon the profession.
📖 افتح في inklap 🔗 DOI 📮 اطلب بحثاً