Channel Tunnel Rail Link section 1: track and power supply

David Bush · Proceedings of the Institution of Civil Engineers - Civil Engineering · 2003

The track and power supply used on the Channel Tunnel Rail Link is closely based on the French TGV system. The first 74 km section in Kent uses a ballasted track, with UIC60 rails on composite sleepers. But, unlike other high-speed railways, the route has numerous tight bends and a requirement to carry lower-speed traffic, resulting in compromised cant values. Traction power is provided by a French-style overhead 25 kV catenary system, though Eurostar trains also have to run on a 750 V third rail system when stopping at Ashford station.

📖 افتح في inklap 🔗 DOI 📮 اطلب بحثاً