inklap

Ways of TPP Power Units Modernization During Their Conversion to Ultra-Supercritical Steam Parameters

, Andrii O. Kostikov, Oleksandr L. Shubenko, , Viktoriia O. Tarasova, · Journal of Mechanical Engineering · 2023

The approach to solving the applied problem of modernization of the 300 MW series power units produced by JSC "Ukrainian Energy Machines" by converting them from supercritical to ultra-supercritical steam parameters, provided that regenerative feed water heating system is preserved as much as possible, which will lead to an increase in the energy efficiency of the TPP with minimal conversion, is analyzed in the paper. The conversion of the K-300-240-2 power unit to the parameters of fresh steam 650 °C/30 MPa and intermediate superheated steam 650 °C/7 MPa, determined as optimal as a result of previous studies, can be carried out by completely replacing the high-pressure cylinder of the existing unit for a new high-pressure cylinder with ultra-supercritical steam parameters and superstructure with an additional intermediate-pressure cylinder while fully preserving the parameters and designs of the intermediate- and low-pressure output parts. Two options for modernization of the 300 MW series power unit thermal circuit structure were considered, and the scale of conversion of the regenerative feed water heating system was evaluated. In the first option of the thermal scheme, the 1st

📖 افتح في inklap 🔗 DOI 📮 اطلب بحثاً